Now in early access

Job readiness
for field operations

SYNNR verifies the crew, truck, tools, certs, inventory, paperwork, and billing backup are ready — before the truck leaves the yard and before the invoice goes out.

4.9from field service operators

Dashboard

Failure costs avoided · YTD
$284,750+47.3%
1D7D1M1Y
SepOctNovDecJanFebMarAprMayJunJulAug
Readiness breakdown
Blocked jobs caught38 before dispatch
+$148,200
Loadout gaps fixed57 tools & consumables
+$94,300
Packets made billable61 completed pre-invoice
+$42,250
Run a readiness check
Readiness checksLast 90 days
August cycle — Permian field ops1,204 jobs checked
96% readyComplete
July cycle — Permian field ops1,118 jobs checked
94% readyComplete
Crane & rigging cert sweep312 jobs · expirations checked
9 blockedComplete
Q3 loadout review890 jobs · awaiting your review
31 at riskIn review

Each check verifies crew, certs, tools, paperwork & billing backup.

Run a readiness check
Certs & inspections12 expiring
J. Alvarez — H2S ClearExpires in 9 days · on 3 scheduled jobs
At risk
Crane 14 — annual inspectionDue in 6 days · assigned tomorrow
At risk
M. Ross — rigging certExpired 12 days ago · pulls him off 2 jobs
Blocked
Crew B-7 — all certs currentCleared for the full schedule
Ready

SYNNR connects certs and inspections to tomorrow's jobs automatically.

Jobs at riskNeeds attention
#4821 · Unsigned ticketHolds billing on completed job
$4,570High
#4790 · Customer form missingRequired by MSA before work starts
High
#4805 · Missing field photosPacket incomplete · 4 of 7 docs
Medium
#4772 · Consumables lowBelow required quantity for job type
restockMedium

Risk flags catch job-blocking issues before the crew rolls.

Job packetsCompleteness
#4833 · Hydro test — Pad 77 of 7 documents
Ready
#4821 · Crane lift — Site B6 of 7 documents · missing signature
86%
#4805 · Tank cleanout4 of 7 documents · missing photos
57%
#4799 · Pipeline inspection5 of 7 documents
71%

Every packet is verified complete and billable before it goes out.

Built for companies that make money with trucks, crews, tools & field execution
Oilfield ServiceIndustrialConstructionEquipment RentalField MaintenanceLogistics

A job can fail before it starts. SYNNR checks the crew, truck, tools, certs, paperwork, and billing backup before the job moves forward — and tells you exactly what to fix.

Failures stopped before they happen

Catch missing tools, expired certs, incomplete packets, and unbillable work

Field-operations readiness for service companies. Upload one job workflow; get back a readiness report that catches what would have gone wrong.

Job Readiness Score

Job Readiness Score

Every job scored Ready, At Risk, or Blocked — across crew, truck, tools, inventory, paperwork, and billing backup.

OK
Crew certsCrew B-7 · all current
Ready
!
Torque wrench #12Calibration due in 6 days
At risk
Customer formRequired by MSA #882
Blocked

Loadout Checklists

Tools, consumables, truck items, and paperwork generated from job type and customer — checked before the truck leaves.

Field Packet Completeness

Tickets, photos, forms, and signatures tracked to 100% complete — so billing never chases the crew.

Cert & Asset Tracker

Employee certs, truck inspections, and tool calibrations — with expirations tied to upcoming jobs.

Customer Rule Library

Every customer's required forms, photos, codes, and billing rules — matched to each job automatically.

Total control

Your operation. One readiness brain.

Drag in loadout lists, crew certs, truck inventory, job packets, tickets, photos, customer requirements, and billing rules. SYNNR turns them into readiness checks for every job.

  • Ingests messy, mixed-format job data
  • Completeness checks on every job packet
  • Customer rules matched to every job
See it on your data
Readiness · Job #RC-4821
ChecksPacket
Rigger cert expired
M. Ross · required for crane lift
blocked
Crew
Torque wrench calibration
Tool #T-12 · due in 6 days
at risk
Tools
Missing field photos
3 of 5 images absent
at risk
No backup
Consumables confirmed
42 line items loaded
ready
Loadout
Job status
At Risk — 4 fixes
Export readiness report
Built for speed

Check every job. Before it rolls.

Self-serve. No integration project. Point SYNNR at tomorrow's jobs and it verifies crews, certs, tools, inventory, paperwork, and billing backup in minutes.

  • Checks at the scale of your whole operation
  • Connects certs & inspections to scheduled jobs
  • Live Ready / At Risk / Blocked status per job
How it works
job-readiness — check
$ synnr check ./jobs/tomorrow
loading 38 scheduled jobs … done
verifying crew certs … done
checking loadouts vs job type … done
! 3 jobs blocked — expired certs
! 5 loadouts missing required tools
! 7 packets incomplete from last week
ready to dispatch: 30 of 38
$ synnr report --readiness
How it works

Three steps to job-ready

From one messy job workflow to a readiness report — self-serve, in an afternoon.

1
field_ticket.pdfuploading
100%
IMG_3391.heicuploading
100%
rate_sheet.xlsxuploading
62%

Upload one job workflow

Drag in loadout lists, crew certs, job packets, tickets, photos, and customer requirements.

2
reading 38 jobs
checking certs & loadouts
14 gaps found

SYNNR checks readiness

Every job is checked against your rules — crew, truck, tools, inventory, paperwork, and billing backup.

3
Ready to dispatch
30 / 38
Cleared

Get the readiness report

Ready, At Risk, or Blocked — with reasons and the fix for each. Run it before every dispatch.

Benefits

Why field teams run on SYNNR

Serious, self-serve readiness for the messy reality of field operations.

Stop avoidable failures

Catch missing tools, expired certs, and incomplete paperwork before they become downtime.

Dispatch with confidence

Every crew and truck verified against the job's requirements before it rolls.

Bill without disputes

Packets and billing backup verified complete before the invoice goes out.

Get paid faster

Clean documentation means fewer rejected invoices and a shorter cash cycle.

Testimonials

Trusted by operators who run on the field

“SYNNR caught an expired rigging cert the night before a crane job. That one catch paid for the year — the job would have been shut down on location.”
RM
Ray MendezVP Operations · oilfield services
“Billing used to chase crews for photos and signatures for weeks. Packets show up complete now — our rejected-invoice rate basically went to zero.”
DK
Dana KohlController · industrial contractor
“Self-serve was the selling point. We uploaded one job workflow and had a readiness report the same afternoon — it flagged gaps we'd been living with for years.”
TW
Tara WhitlockOwner · equipment rental & service
ROI calculator

See what unready jobs cost you.

Estimate what missed tools, expired certs, and incomplete packets cost your operation — and what SYNNR protects.

Tickets, work orders & service calls
Typical billed amount per job
Missed tools, certs, paperwork & backup
SYNNR protects ≈
$378,000
per year, from jobs that would have failed or gone unbilled
Annual cost of unready jobs$630,000
Recommended planGrowth · $11,988/yr
Net annual gain$288,000
Return on subscription4.2× · pays back in ~12 weeks
Get job-ready — choose your plan

Estimate only · flat monthly pricing, cancel anytime

Pricing

Pricing that scales with your operation.

Flat monthly pricing. No contracts, no per-seat math — month to month, cancel anytime.

Pro
$499/ month

For service companies with recurring field jobs.

Request access
Included
  • Job readiness dashboard
  • Loadout checklists by job type
  • Cert & asset tracking
  • Email support
  • Enterprise
    Custom

    For multi-site fleets and complex operations.

    Talk to us
    Everything in Growth, plus
  • SYNNR data unification
  • Dedicated success manager
  • Custom integrations & SSO
  • Volume pricing & custom terms
  • Common questions

    All you need to know

    SYNNR is field-operations readiness software. It verifies the crew, truck, tools, certifications, inventory, paperwork, customer rules, and billing backup are ready before a job moves forward — and tells you exactly what to fix when they're not.

    Loadout lists, crew certs, truck inventory, job packets, field tickets, photos, forms, customer requirements, and billing rules — in mixed formats. SYNNR turns them into reusable readiness checks.

    It's self-serve by design. There's no integration project — create a workspace, upload one job workflow, and get your first readiness report the same afternoon.

    Your job data is encrypted in transit and at rest, never used to train shared models, and processed under a non-custodial architecture. You stay in full control of your data and pricing — always.

    Asset-heavy operations that run on field execution — oilfield service, industrial contractors, construction service, equipment rental & service, and field maintenance companies. If money is made in the field and billed in the office, it's built for you.

    Request Early Access

    Stop job failures
    before they happen.

    A missing tool, an expired cert, or an incomplete packet can sink a job before it starts. Check readiness before the crew rolls — and bill clean when the work is done.